Description and Specification for Lab Tenders
Air Conditioning Unit.
The air is then passed over a nozzle from a steam boiler, which allows
the air to be humidified. The next component in the duct is the
evaporator of the integral refrigeration unit. As the air passes through
the evaporator it is cooled down. The evaporator housing also allows
any water which condenses from the air to be collected in an external
vessel. Air is drawn into the duct by a variable speed fan, and is
passed through a flow straightener to the preheat heating elements.
After the evaporator the air passes over the reheat elements and out
through a louvered exit. Temperature and RH sensors are provided at the
air inlet, after the preheat and humidifier, after the evaporator and
after the reheat. The air flow is measured by an electronic sensor.
Underneath the duct are mounted the steam boiler for the humidifier, the
compressor and condenser for the refrigeration system and the
electronic control box. The mains supply voltage is monitored in the
equipment to allow calculation of effective heater powers.
Specifications:-
• Computer controlled via USB interface, with complete
educational software including data logging, graph plotting with real
time updates, mimic diagrams, data export.
• Air Conditioning teaching system, complete with initial
heating stage, humidifier, chiller/dehumidifier and final heating
stage.
• Transparent duct (200mm x 200 mm) for complete visibility of the process.
• Educational software, replicating the psychrometric chart calculations.
• Electronic Flowmeter to measure the air flow in the duct.
• Dual control of boiler setting with a fast heat up setting and a gentle setting for control.
• 4 sets of Temperature and Relative Humidity measurements at the various stages of the process.
• RH sensors come with calibration values which can be entered into the software for best accuracy